    Max
    Do you have an idea when the new version will be released for production use? Will beta's be available? Will they run concurrent with 2018 or will it have to be removed to try the new version?

    Not trying to hold you to anything, just getting excited about the new toys

    Paul
     
  2. Max

    Max Administrator Staff Member

    Should have a clearer picture in a week or two. We have to implement an upcoming release from our display partner prior to releasing to you, as that will fix some must-fix issues. This release is taking a bit longer than normal due to the sheer scope of implementation.

    Short answer is "when it's ready". The production release is probably 2 months away, give or take 2 weeks. The beta is probably 2-3 weeks away. All subject to change.

    Our releases, as usual, are not able to be run concurrently. The beta will have all the typical caveats.

    Do get excited about new toys though...this release is pretty awesome :D
     
    MKR, oldfox, nehemiah126 and 6 others like this.
  3. batejosh

    batejosh Member

    Exciting to see all the news of the new release. It looks like it is going to be fantastic!

    My maintenance expires in 29 days. When I bought last year I was expecting it would cover the 2019 release. Is there any chance that Alibre will be able to give me the 2019 release on this maintenance period?
     
    MKR and Mika like this.
  4. Mika

    Mika Member

    How is it really going, if we'll pay one year maintenance and that new version will not come during that maintenance year? We get it or not? That would be nice to know...
     
    batejosh likes this.
  5. Max

    Max Administrator Staff Member

    The beta will launch in 3 days or so most likely. If it goes well, we'll launch 2019 around 7/1, plus or minus.
     
    KRELER, Mika, OTE_TheMissile and 2 others like this.
  6. Lew_Merrick

    Lew_Merrick Alibre Super User

    Mika -- It was 3D Systems (not Alibre) that (a couple of times) did mot do an update within a calendar year. Alibre has pretty consistently issued two updates each calendar year (though their may be an "exception: I am forgetting) since 2009. Whereas the Forum here does provide a wealth of "operational knowledge" with respect to Alibre Design, having Alibre Support on your side jas a real "value." And no, I am not an employee of Alibre.
     
    Mika likes this.
  7. DavidJ

    DavidJ Alibre Super User

    Calendar days or working days, Max? Public holiday in USA & UK Monday 27th.

    Please spell out the month in dates - lots of the world has numeric date format different from USA. I assume you are indicating launch approx. 1st July.
     
  8. Max

    Max Administrator Staff Member

    It's also worth noting that there are different kinds of releases. Some releases where most of the stuff is just "new features" are much easier to predict. New features tend to be somewhat sandboxed in their own little areas. This release contains fundamental changes that affect literally everything related to graphics (aka - anything you see, or click, or preview). Those kinds of releases tend to take longer.

    For example, you might read "we updated the graphics pipeline", but consider:
    • 3D graphics
    • New 3D performance options
    • The view triad
    • Reference geometry
    • Redoing picking / selection everywhere in the product
    • Changing the scene graphs
    • Every preview type, for example a 2D fillet preview
    • In 2D workspaces
      • every figure
      • every view type
      • every annotation
    • the list is much longer but you get the idea...
    So this release taking more time is an indication of the fact that it was an enormous project for us, and nothing more. And, we think it's worth it.
     
    Mika, swertel and NateLiqGrav like this.
  9. Max

    Max Administrator Staff Member

    I have what we are hoping is the final beta build in my inbox right now - if all goes well we'll launch it on Tuesday/Wed.

    About a month give or take a week or two after that, we'll launch 2019, depending on beta issues (or non-issues).

    Max
     
    KRELER, MKR and Drutort like this.
  10. DavidJ

    DavidJ Alibre Super User

    Max, thanks for clarifying!
     
  11. simonb65

    simonb65 Alibre Super User

    @Max , a little bird told me that Split Views have been removed (before the bugfix I reported has even been released!). Is this the case? ... and why? This is one of my primary workspaces and yet again its a key functionality cut.

    Apart from the great new rendering options, 2019 is getting thinner and thinner on functionality when compared to 2018.1! I hope this functionality will be restored soon.

    I've never known another application of this size removing so much. As a developer, I can never understand why you would take out features you have already invested time and resource into implementing when it forms part of the feature set that sold the product in the first place and how you can continue to justify the same product price and increases in maintenence renewal!
     
    jokejoke likes this.
  12. Max

    Max Administrator Staff Member

    Nothing has been removed. Some things have been "de-emphasized" from the ribbon. For example, the split view button is no longer on the ribbon. Neither is Selection Filters. They are still available.

    We'll see how people react in the beta, and adjust as needed. If a ton of people convey dissatisfaction about it, or others, we'll put it back into the ribbon.

    We're trying to streamline and simplify, and selection filters for example aren't widely used by most people, and when they are used it's for a very specific workflow typically. The Home Window button...etc. So should a tool like that clutter everyone's ribbon? Scale that concept to 5-20 tools and you start to get a cluttered experience. We have big plans for 2020 already in the works that addresses a lot of this, in a way you will like, but I'll talk about that later. :D For now, we're trying to simplify a bit.

    But everything is still there, just accessible via toolbars or menus etc.
     
    NateLiqGrav, MKR, jokejoke and 3 others like this.
  13. simonb65

    simonb65 Alibre Super User

    Many thanks for the clarity @Max .
     
    MKR likes this.
  14. NateLiqGrav

    NateLiqGrav Alibre Super User

    Short memory Simon?
    VS
     
  15. simonb65

    simonb65 Alibre Super User

    Not at all! I use split view in most of the CAD packages I utilise and for most of my part creation process. I find it less time consuming that constantly rotating and spinning round the model in a single free view, The only time I specifically don't use it in Alibre, is for editing and inserting 3D splines, because the movement of nodes in the 3 views is not intuitive and movement planes are not automatically selected based on the view plane. So for that specific use case (i.e. cable and wire routing), I do that kind of work in MOI, because it just works.

    The reference to removing, was with regards to the ribbon, not the split views! So a little context to what I was actually referring to is required here!
     
  16. NateLiqGrav

    NateLiqGrav Alibre Super User

    From the prevous thread:
     
  17. simonb65

    simonb65 Alibre Super User

    @NateLiqGrav , just to be perfectly clear, the information I heard (not from these threads and more recent than those posts) was that the entire Split View feature was being removed, not just the buttons from the ribbon. If it was just buttons, I wouldn't have posted my earlier post!! It has since been confirmed by @Max that what I heard is not the case. So, end of the matter as far as I'm concerned.
     
    Last edited: May 29, 2019
    JL82 likes this.
  18. Max

    Max Administrator Staff Member

  19. OzBrand

    OzBrand Member

    So how's the feedback coming along Max?
     
  20. Max

    Max Administrator Staff Member

    Well. Mostly known issues we are waiting on a 3rd party to resolve. Hoping we are about 2.5 ish weeks out.
     